Baker Cranes designed, manufactured & commissioned a 10t Crane for Mangorei Hydroelectric Power Station.
The new crane replaces an old hand operated crane built in the 1930’s by Herbert Morris & Bastert inc. of London.
New Crane Commissioned May 2015.