Baker Cranes designed, manufactured & commissioned a 10t Crane for Mangorei Hydroelectric Power Station.

The new crane replaces an old hand operated crane built in the 1930’s by Herbert Morris & Bastert inc. of London.

 

New Crane Commissioned May 2015.

 

By |2018-10-15T03:08:11+12:00October 15th, 2018|News|